File Metadata
- Mime Type
- image/png
- Attributes
- Image, Can CDN
- Storage Engine
- blob
- Storage Format
- Raw Data
- Storage Handle
- 116803
- Default Alt Text
- preview-thumbgrid-profile (220×220 px, 1 KB)
Event Timeline
Hey neighbors, we live in a 1980s split-level near Lake Hills in Bellevue and are finally planning a major main-floor update this year. Our biggest goal is knocking down the wall between our cramped kitchen and dining room to open up the layout, plus redoing our outdated upstairs bathroom. We've already talked to two contractors, and both gave us super vague ballpark quotes that make me nervous about massive change orders once demolition starts—especially since that kitchen wall might be load-bearing. For anyone on the Eastside who has done a kitchen or multi-room remodel recently, who did you hire that actually stuck to their initial estimate, handled city permits smoothly, and kept the rest of the house livable during construction?
One mistake a lot of first-time renovators make is waiting until demolition starts to finalize their shower mixing valves, niche sizes, and tile edge trim. During our prep meetings with newdayconstruction.co, they walked us through every single fixture and finish selection weeks before demo day. Having all the rough-in valves on site bathroom remodeling contractors in Bellevue early prevented supplier backorders from stalling our tile setter.