- Pre development risk assessment (128×392 px, 13 KB)
Event Timeline
Before fully committing to design development, I want to better understand the technical risks embedded in the proposed concept. Some assumptions appear reasonable on paper but feel uncertain from a construction standpoint. What early technical assessments are most effective at identifying these risks before they affect cost and schedule?
Before committing to design development, I learned that risk becomes visible only when conceptual ideas are tested against construction reality. On similar projects, I focused on early assessments that reviewed structural feasibility, system interfaces, access constraints, and preliminary sequencing rather than just design intent. Using evaluation principles aligned with https://www.fields-builds.com/blog/cutting-costs-avoiding-delays-constructability-reviews, I challenged assumptions about complexity, tolerances, and installation logic that looked acceptable on paper. These early technical assessments exposed cost and schedule risks while changes were still manageable, allowing informed decisions before those risks translated into downstream construction issues.